How To
Pegboard Installation onto masonry walls
Hold pegboard in desired position
Using a spirit level check level, use a pencil to mark hole positions through mount holes onto the wall
Remove pegboard and drill holes with 6mm masonry drill bit
Make sure holes are deeper than wall plugs supplied
Place pegboard back on wall and insert plastic wall plug through the panel and into the drilled holes, as per image.
Tap screw in gently and tighten a few turns with a screw driver
Push screw cover into opening to cover screw
__________________________________________
Pegboard Installation using adhesive pads
Place the adhesive pad on the rear of the pegboard and insert into mount slot.
From the front of the pegboard, insert supplied screw into the mount pad hole and tighten using a star screw driver.
Do the same for all four pads.
On the front side, push the screw cover into opening to cover screws
It should look like this.......
Before removing the adhesive strips, decide where you want to place your pegboards.
Use a level and pencil marks for alignment.
Clean the surface of the wall where the pads will stick to with rubbing alcohol.
Remove all four cover strips and place pegboard in desired position, pressing firmly against the wall.
We use only certified 3M adhesive tape for good adhesion
To remove pegboard, remove the screw covers, remove all four screws with a star screw driver. Remove the pegboard.
Slide a paint scraper between the pad and the wall and lever pad off the wall.
________________________________________________________________
Kitchen Rail Installation
